SOUTH+BRIDGE
Tech AI-translated

32 H200 GPUs Coming to Myeongji-Noksan

Busan has been selected for a Ministry of Trade, Industry and Energy competition to build an 18.3 billion won shipbuilding and maritime edge AI data center in Myeongji-Noksan Industrial Complex. With 32 H200 GPUs and 168 domestic NPUs, it's the nation's first hybrid structure in an industrial complex. Tenant companies will use it from December at half the cloud cost.

남포 데스크 · July 17, 2026 · 4 min read

AI Summary

Busan will construct an 18.3 billion won edge AI data center in Myeongji-Noksan Industrial Complex, featuring 32 Nvidia H200 GPUs for training and 168 domestic NPUs for inference—the first hybrid GPU-NPU structure in a Korean industrial complex. The facility will offer smart factory, vision AI safety, and digital twin predictive maintenance services to tenant companies at up to 50% off commercial cloud rates starting December. This marks a shift from large-scale private AI infrastructure to practical, factory-adjacent public computing resources for manufacturing SMEs.

32 H200 GPUs Coming to Myeongji-Noksan

Busan's manufacturing AI transformation is moving past the planning stage to power-on. The city has been selected as a finalist in the Ministry of Trade, Industry and Energy's 2026 Industrial Complex Edge AIDC Demonstration Pilot Project competition to build an 18.3 billion won shipbuilding and maritime edge AI data center in Myeongji-Noksan National Industrial Complex. The target is a beta opening in December this year.

The funding structure consists of 14 billion won in national funds, 2.1 billion won in municipal funds, and 2.2 billion won in private funds. The Korea Industrial Complex Corporation Busan Regional Headquarters will lead the project, with participation from Elice Group, Busan Techno Park, EG AI, Gunsolution, and Formit. After a 12-month construction period from July this year to June next year, mandatory operation will continue for five years.

183억
Total Project Cost (14 billion KRW in government funding)
32장
NVIDIA H200 GPUs
168장
Domestic NPUs (84% of total)
50%
Maximum savings compared to commercial cloud
Myeongji Noksan Edge AI Data Center, By the Numbers

The standout feature in the design is the chip configuration. It's a role-separation structure where Nvidia H200's 32 GPUs handle training and validation, while 168 domestic NPUs handle inference and continuous services. This is the first edge AI data center among industrial complexes nationwide to use both GPUs and domestic NPUs together, raising the domestic chip ratio to 84%. It's a demonstration stage where domestic AI semiconductors are deployed not in showcases but in continuous infrastructure next to factories.

NVIDIA H200Domestic NPU
Quantity32 units168 units (84%)
FunctionModel training and validationInference and continuous service
SignificanceValidated training standardFirst continuous deployment of domestic chips in industrial complex
Role-Separated Chip Configuration

Tenant companies will receive three types of manufacturing AI services. Smart factory, vision AI industrial safety, and digital twin predictive maintenance software will be provided sequentially, with usage fees set at up to 50% cheaper than commercial cloud. Myeongji-Noksan is a complex densely populated with shipbuilding equipment and machinery-metal companies, so the calculation is to provide shared access to computing infrastructure that individual companies cannot afford. Busan Mayor Jeon Jae-soo stated that the city will provide shared infrastructure for manufacturers lacking resources to experiment with and adopt AI without burden, and that Busan will present the nation's first model of manufacturing AI demonstration based on domestic AI semiconductors.

July 2026: Selected through public offering
December: Beta launch
June 2027: Construction completed
5-year mandatory operation
Expansion to Daebul-Gunsan shipbuilding belt
Project Timeline

Busan's AI infrastructure now splits into two tracks. On the private side, a 19 trillion won large-scale AI data center project has launched, while on the public side, this 18.3 billion won edge center attaches to manufacturing sites. The scale differs by a hundredfold, but the latter arrives first for startups and factories. In December, tenant companies in Myeongji-Noksan will begin using H200 at half the cloud cost. Busan's plan is to create a model capable of self-sustaining operation even after the mandatory period ends and expand it to the southeastern region, Daebul, and Gunsan.

This article was automatically translated from the Korean original by AI. For the authoritative version, read it in Korean.

한국어 원문 읽기 →